Lindsay Civil performed civil works associated with the installation of new Transmission cables to feed a new Zone substation at Wilton, NSW.
The project was managed over 10 weeks and included both the installation of transmission conduits and joint bays in the road way at Wilton and the installation of transmission conduits into an existing zone substation at Maldon, NSW.